Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study by the Economic Research Institute at the Bulgarian Academy of Sciences. The greatest benefit..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian history. "I would like to thank the academic community, especially Academician Julian Revalski..
The results of the samples taken from the infected herds near Velingrad are 100% reliable and have been confirmed with a second test, Deputy Minister of Agriculture and Food Deyan Stratev said an interview with public service broadcaster BNT. In his..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
On the occasion of World AIDS Day, observed on December 1, volunteers from the Bulgarian Red Cross Youth in Sofia will light tealights on the Lovers'..
+359 2 9336 661