Bulgaria’s cabinet adopted a resolution that the new 400 KV electric transmission network between Maritsa East substation in Bulgaria and Nea Santa substation in Greece will become an object of national significance. The European Commission defined that project as a project of common European interest. It includes the construction of 4 power grids needed for the fulfillment of the high-priority electric corridor North-South. The construction of a new inter-system power grid with a total length of 122 kilometers on Bulgarian territory and 29 kilometers on Greek territory is a key element of that project. The power grid will have a capacity of 1,500 Megawatts and will connect Maritsa East and Santa Nea substations.
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29 aircraft engines. The maximum period for carrying out the repair of each engine will be no more..
The chief of police in Petrich and two other police officers, arrested two days ago, are accused of participating in a criminal group. This was announced by Sofia city prosecutor Iliana Kirilova, BTA reported. According to Kirilova, the detained..
The Sofia City Prosecutor's Office has announced the release of Dzheyhan Ibryamov. He will be released from custody tomorrow, November 7, and the investigation against him on charges of influence peddling will be suspended at the moment he takes the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
A protest organized by nationalist organizations in front of the Ivan Vazov National Theatre last night against the premiere of Bernard Shaw’s play..
On Friday, there will be fog in the valleys. The lowest temperatures will range between minus 5°C and 0°C, for Sofia around minus 3°C. It will be sunny..
+359 2 9336 661