A Memorandum of Understanding on the realization of the Vertical Gas Corridor has been signed by representatives of gas companies Bulgartransgaz EAD (Bulgaria), ICGB AD (Bulgaria), DESFA S.A. (Greece), FGSZ LTD (Hungary) and SNTGN TRANSGAZ S.A. (Romania), the Ministry of Energy announced. The document was signed during a joint meeting in Bucharest, Romania. Let us recalled that in September 2016, the energy ministries of Bulgaria, Greece, Romania and Hungary signed a memorandum on the implementation of the Vertical Gas Corridor within a meeting of the High Level Group on Central and South Eastern Europe Gas Connectivity (CESEC).
On Friday, the lowest temperatures will be between 4°C and 9°C, reaching up to 12°C in the southeast, around 6°C in Sofia . During the next 24 hours, the weather will remain cloudy. It will rain in almost the entire country. During the day, rainfall..
The Varna District Court has released the city’s mayor, Blagomir Kotsev, on a financial bond of €102,258. Before the court’s decision was announced, supporters of the mayor and members of the We Continue the Change party gathered outside the..
Three people, including an Italian citizen, were arrested during last night's protest against the adoption of the 2026 budget in front of the National Assembly, the director of the Sofia Directorate of Internal Affairs, Chief Commissioner Lyubomir..
+359 2 9336 661