The construction of Struma motorway section between the towns of Sandanski and Kresna is two months ahead deadlines, engineer Temenuzhka Filipova from the Road Infrastructure Agency told BNR. We are doing daily control on the quality of the construction works, engineer Filipova pointed out. No other motorway in Bulgaria was subject to such monitoring before. Four laboratories are testing the quality of the materials used in the construction of Struma motorway, Temenuzhka Filipova went on to say. This section of Struma motorway is 24 kilomneters long and 29 meters wide. The cost of this section was estimated at EUR 118 million and construction works have to end in 2019.
A campaign against street violence named Stand Up will be held today and tomorrow under the dome of Sofia's Largo, said the Regional History Museum – Sofia. It turns out that over 80% of women worldwide have experienced some form of street..
A mural dedicated to the 20th anniversary of Bulgaria's NATO accession will be unveiled today in Pernik. The event will be attended by the ambassadors of Great Britain, Turkey and Montenegro, Deputy Foreign Minister Nevyana Miteva, Pernik Regional..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed will reach 10-15 m/s. With it, cold air will invade the country and temperatures will drop and by..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly...
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The second edition of the Festival of Apiculture Products continues in Pleven. The exposition features honey and apiculture products, as well as honey..
+359 2 9336 661