According to approximate estimates, to construct the transport, rail and digital infrastructure in the Western Balkans will cost 30 billion euro, said Bulgarian PM Boyko Borissov at the opening of the third EBRD Western Balkans investment summit taking place in London.
The Bulgarian prime minister made this estimate and presented maps of Pan-European corridors 4,8 and 10 as well as the rail infrastructure in the region. In Borissov’s words, everything can be constructed within the next 7-8 years, provided there is a clear plan and financing from the EBRD, the Juncker plan and co-financing from the national budgets. 30 billion euro for the infrastructure in this “piece of heaven”, the Western Balkans, is not much, considering that around 50 billion was spent on the wars in the region years ago, the Bulgarian prime minister commented.
God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..
An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..
Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..
For the first time in recent election history, the end election result leaves a party running in the election outside the National Assembly with a..
The European Parliament has approved the nomination of Bulgarian Ekaterina Zaharieva as European Commissioner. She will be in charge of the 'Start-ups,..
A meeting of the interior ministers of Bulgaria, Romania and Austria in Budapest could lead to a change in Austria's stance on the two countries joining..
+359 2 9336 661