Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kiril Petkov resigns as co-chair of "We Continue the Change"

Kiril Petkov announced at a briefing that he is taking political responsibility and resigning as co-chair of "We Continue the Change" (part of the PP-DB coalition, which has the second largest number of MPs in the National Assembly)..

published on 6/25/25 3:59 PM

Bulgaria has a palette of advantages, little known to Japanese companies

A Japan-Bulgaria business forum on the topic of "Infrastructure, Energy and Digitalization" was held in Sofia. "Bulgaria has a whole palette of advantages. However, they are little known in Japan. Our task is to provide much clearer..

published on 6/25/25 2:34 PM

Checks reveal drastic price increases in some retail outlets

During joint inspections by the National Revenue Agency, the Commission for Protection of Competition and the Commission for Consumer Protection, price increases of between 5 and 83% were found. The chair of the Commission for..

published on 6/25/25 1:20 PM