Bulgaria and Greece signed an agreement for construction of the gas interconnector between the two countries. The project will be fulfilled by a joint venture. Bulgaria and Greece will have equal participation in the company. Initially the interconnector will have the capacity to transfer 3 billion cubic meters of gas per year. Later, it will reach its maximum capacity of 5.5 billion cubic meters. The interconnector is expected to start functioning until 2020.
Food Safety Agency (BFSA) has now sent samples from herds found to have peste des petits ruminants (PPR) to the reference laboratory in Montpellier, France, for confirmation as a measure to increase public confidence in the work of the institutions...
Bulgarian President Rumen Radev gave a lecture on the prospects and challenges for young people at the University of National and World Economy in Sofia. At the end of his speech, he answered questions from students. Asked about the wars in..
The European Commission is insisting on the urgent implementation of strict measures to eradicate the outbreak of sheep plague in Velingrad. In a statement, the Directorate-General for Crisis Preparedness in Food, Animals and Plants of the..
By order of the Minister of Education and Science, Prof. Galin Tsokov, January 3, 2025, has been declared a non-school day for all schools in Bulgaria...
The coalition BSP-United Left, which placed fifth in the parliamentary elections held on October 27, is starting a series of negotiations to gather..
10 people from a criminal organization for migrant trafficking have been detained in a police operation in the Burgas region . Among those detained is..
+359 2 9336 661