Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor Bozhankov", the party's co-chairman Kiril Petkov wrote on Facebook. Silvi Kirilov, nominated by "There..
In a record-long session lasting 18 days, Bulgarian MPs made a seventh failed attempt to elect a speaker of the National Assembly. After several breaks and a re-vote for the oldest MP, Silvi Kirilov from “There Is Such a People" (ITN), only a few..
The leader of “МРФ – New Beginning” Delyan Peevski has expressed his readiness to take the post of prime minister. “When we are the first party, I will form a government,” he said on the sidelines of the National Assembly. “If the Bulgarians give..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661