Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Vladislav Goranov: Bulgaria can adopt Euro in less than three years

Photo: BGNES

If the Bulgarian banks pass successfully the stress tests and the asset quality review, this country will be able to apply for the ERM2 mechanism in the beginning of July this year. The average stay in the Eurozone waiting room is two years and then the applicant countries usually need another year to prepare for the introduction of the European single currency. Bulgaria can adopt the Euro no earlier than January 1, 2022, this country’s Minister of Finance Vladislav Goranov announced. Minister Goranov attended a discussion in Sofia themed Bulgaria’s Path to the Eurozone. Valdis Dombrovskis, Vice President of the EC in charge of Euro, Social Dialogue, Financial Stability, Financial Services and Capital Markets Union and MEP Eva Maydell also took part at the forum.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM