Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Operational readiness of Unit 5 of Kozloduy NPP tested for upgraded power performance

Photo: BGNES

After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.

The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov

Parliament rejects GERB-SDS cabinet proposal

After a heated debate, Parliament rejected the proposed GERB-SDS cabinet with Rosen Zhelyazkov as Prime Minister. It was supported by 98 MPs, with 138 voting against and two abstaining. Zhelyazkov, representing the first political force in Parliament,..

published on 7/3/24 4:42 PM

Poll: 63% of Bulgarians say increasing arms supplies to Ukraine is a 'bad idea'

Ukrainian optimism clashes with European scepticism ahead of the NATO summit, with divisions emerging over defence spending and how the war will end. These are the conclusions of a report based on a new survey by the European Council on Foreign..

published on 7/3/24 3:28 PM

People in northern Greece thank Bulgarian fire-fighters for their help

Under the program of the European Civil Protection Mechanism, 240 firefighters from 4 countries arrived in Greece to help their Greek colleagues, the Bulgarian Fire Protection Directorate has reported. Due to the high temperatures..

published on 7/3/24 11:53 AM