Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Operational readiness of Unit 5 of Kozloduy NPP tested for upgraded power performance

Photo: BGNES

After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.

The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Good neighbourly relations are key to the EU integration of Balkan countries

At the invitation of his German counterpart Annalena Berbock, minister Ivan Kondov participated in the meeting of foreign ministers of the countries of the Berlin Process. At the forum in Berlin, Kondov pointed out the importance of..

published on 10/2/24 11:27 AM
Jerusalem, 1 October 2024

Bulgarians in Israel are calm before the holiday of Rosh Hashanah

Bulgarian Jew David Levi, who survived Iran's missile attack against Israel in a bomb shelter, has told BNR that the situation in the country has calmed down with the opening of the airspace. This is a sign that the attack has passed,..

published on 10/2/24 10:39 AM

European heads of state celebrate 70th anniversary of CERN

Bulgaria continues to be dedicated to the joint mission of developing the potential of science in support of peace in a world of fierce competition and for the positive development of our societies. This was what Bulgarian President..

published on 10/2/24 9:48 AM