The scheduled testing of Unit 5 of Kozloduy NPP has been completed successfully, confirming the operability of the equipment in the conditions of upgraded power capacity in different modes of operation.
All activities throughout the different stages of the approved testing programme were completed according to schedule, and on 14 July, the unit was connected to the country’s energy grid. The test results will be summarized in a report which will be submitted to the Nuclear Regulatory Agency.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661