The extension of the Turkish Stream gas pipeline will pass through Bulgaria, not Greece, Russia’s Energy Minister Alexander Novak told journalists today at the sitting of the Russia-Turkey Intergovernmental Commission on Trade and Economic Cooperation in Antalya. The gas pipeline which has to connect Russia and Turkey via the Black Sea will start functioning on January 1, 2020. The extension which will pass through Bulgaria, Serbia and Hungary is expected to start functioning in stages. The first gas deliveries to Bulgaria are expected to be made in 2020. The pipeline will have the capacity to transfer 15.75 billion cubic meters of gas per year.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661