Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Sotir Tsatsarov heads Bulgaria’s Anticorruption Commission

Photo: BGNES

The Bulgarian MPs approved the candidature of Sotir Tsatsarov to become Chairman of the Commission for Combating Corruption and Withdrawal of Illegally Acquired Property. 165 MPs voted in favor, 30 MPs voted against and 3 MPs abstained. Tsatsarov, who currently serves as Prosecutor General of Bulgaria, was nominated for Chairman of the Anti-corruption Commission by the ruling coalition.  Sotir Tsatsarov has long experience and merits during his term of office as Prosecutor General. Moreover, there is good cooperation between the Anti-corruption commission and the Prosecutor’s Office, MP Emil Dimitrov from the United Patriots pointed out. Dimitrov had personally negotiated with Bulgaria’s Prosecutor General Tsatsarov to submit his candidature for head of the Anti-corruption Commission.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM