The binding phase of the market test for the reservation of capacity from the floating liquefied natural gas terminal near the Greek town of Alexandroupolis on the Aegean coast has been successfully completed. Greek, international companies and end-users have confirmed their interest, the company Gastrade has reported. The binding offers are for a period of up to 15 years and have reached a volume of 2.6 billion cubic metres annually.
GERB/SDS has withdrawn its nomination for president of the National Assembly. In the upcoming 8 th attempt to elect a president of parliament, there will be 3 candidates. Vazrazhdane is once again nominating Petar Petrov. There Is Such a People (ITN)..
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661