Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Political analyst Evgenii Dainov: It is high time we thought about the economy as well

Political analyst Evgenii Dainov
Photo: BGNES

While all countries in Europe are already announcing phased strategies for exiting the lockdown caused by the Covid-19 pandemic in order to avoid the arrival of hunger, the only thing we are doing is to keep counting the numbers of those infected. Such an opinion was expressed in an interview with the Bulgarian National Radio by Bulgarian political scientist Evgenii Dainov. He argued that due to the lack of strategic management of the crisis, Bulgaria will have to pay an excessively high economic cost. 

"If no such strategy is developed soon, there will be protests. The Bulgarian people are moderate people, but from time to time they tend to take to the streets to state their position in public places," the political analyst predicts.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM