Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Scheduled repair starts of Unit 5 of Kozloduy NPP

Photo: Radio Vidin

Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.

The sixth unit of Kozloduy NPP is operating at full capacity.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

2024 was the warmest year in Bulgaria since 1930

The past year 2024 was the warmest year for Bulgaria since 1930. This is shown by the analyses of the National Institute of Meteorology and Hydrology.  2024 had an average temperature for the country of about 2.1 °C above climate norms and..

published on 1/6/25 6:16 PM

Cadets from Vietnam are training at the Air Force Academy in Dolna Mitropolia

Cadets from Vietnam are training at the Georgi Benkovski Air Force Academy in Dolna Mitropolia. This year they will study Bulgarian, after which their flight training will begin. This was what the head of the school, Brigadier General..

published on 1/6/25 3:57 PM

People in Kalofer pay respect to revolutionary and poet Hristo Botev

On January 6, Epiphany, Bulgarians celebrate 177 years since the birth of poet and revolutionary Hristo Botev. On this occasion, the atmosphere in Kalofer - Botev's hometown, is special, Dimitar Vladimirov from Radio Plovdiv has..

published on 1/6/25 3:45 PM