Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Honouring the memory of Exarch Joseph – the first exarch in post-liberation Bulgaria

Monument to Exarch Joseph in front of the exarchic house
Photo: Miroslav Vassilev

It is 180 years today since the birth of Exarch Joseph, the first Bulgarian exarch in post-liberation Bulgaria, who ruled the Bulgarian Orthodox church in the course of 38 years.

Exarch Joseph was born on 5 May, 1840 in the town of Kalofer under the secular name of Lazar Yovchev. He studied in Constantinople and later graduated literature and law from the Sorbonne. When he became a monk in 1872 he took the name Joseph. In 1877, when the Russo-Turkish war broke out, he was elected Bulgarian exarch. 

Exarch Joseph I opened a Bulgarian theological seminary in Constantinople, helped build churches, assisted the training of priests, the opening of schools, sending gifted young people to study abroad. In 1902 he was elected honorary member of the Bulgarian Learned Society, later renamed Bulgarian Academy of Sciences. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM