From the government helicopter, Prime Minister Boyko Borissov showed his guest, the President of Serbia Aleksandar Vucic, how the construction of Balkan Stream is progressing.
The gas pipeline is 474 km. long. Two compressor stations, with cutting edge US equipment and the option of reverse flow, will be built close to the border with Serbia. The gas pipeline will be used for Russian natural gas, as well as gas from Bulgaria’s interconnector with Greece coming from the Alexandroupolis LNG terminal.
“The interconnector between Bulgaria and Greece is very important to the diversification of gas supplies in the region, and Balkan Stream is being built in strict compliance with the EU rules,” Boyko Borissov pointed out.
The President of the European Council, Antonio Costa, and Prime Minister Rosen Zhelyazkov visited Arsenal, Bulgaria's largest arms manufacturer, in Kazanlak. The management of the factory presented the technological capabilities of the plant, its main..
Payments under the Recovery and Resilience Plan (RRP) have doubled in recent months, Deputy Prime Minister Tomislav Donchev has announced. He added that he was optimistic about receiving the delayed tranches and the remaining funds under the RRP...
Despite active and targeted efforts to recruit personnel, the percentage of vacant positions at the State Intelligence Agency (SIA) remains high, reads the 2024 report of SIA, published on the website of the Council of Ministers. Another issue..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of..
The United States is a key strategic partner and NATO ally, with whom we will continue to work together to achieve our common goals — energy security,..
In an open letter to Prime Minister Rosen Zhelyazkov and the Ministers of Agriculture, Finance and Economy, the Bulgarian Farmers' Union calls for new..
+359 2 9336 661