The construction of Balkan Stream gas pipeline has actually been completed- its Bulgarian and Serbian sections have been connected, the Russian news agency TASS informs without quoting its source of information. According to the same source which is taking part at the construction of the pipeline, the official inauguration ceremony is postponed due to the coronavirus epidemic, BGNES reports.
Balkan Stream is an extension of Turk Stream gas pipeline project. The Bulgarian-Serbian section will allow additional supplies of Russian natural gas for Serbia and Hungary. The extension was named Balkan Project at the proposal of Bulgaria’s Premier Boyko Borissov. The pipeline is 474 kilometers long and will have the capacity to transfer up to 20 billion cubic meters of gas per year.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661