Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Strongest month for winter tourism is about to fail in Bulgaria's Bansko

2
Photo: banskoski.com

The stricter measures to limit the coronavirus have been imposed with too much delay. This is the opinion of the tourist branch in Bulgaria's ski resort of Bansko in the Pirin Mountains

The strongest month for the winter tourist season is about to fail. The idea of ​​Germany to close winter resorts throughout Europe is already having a severe impact on the Bulgarian tourist sector. Reservations are being cancelled en masse. 

The tourism industry representatives insists on allowing at least the hotel restaurants to work only for the guests in the accommodation places, as the food served in the rooms reduces the quality of the service and makes the exceptional safety measures meaningless, BNR reported. 

The concessionaire of the ski area in Bansko has announced readiness to open the season on December 4th. However, it is still unclear whether this will happen.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

Gallery

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM