The government has approved a report on the possibilities of building a new reactor on site 2 at Kozloduy NPP. The environment assessment has approved the technology of the American AP 1000 units and the Russian technologies for Belene NPP, Energy Minister Temenuzhka Petkova said. In the report, the experts support realization of Unit 7 at Kozloduy NPP with available equipment from the Belene NPP project.
"I think that after the 7thunit, we could go on to built 8th one," Prime Minister Boyko Borissov said, pointing out that the projects were in accordance with EU goals for climate neutrality by 2050 and diversification of energy resources. A model for financing of the new capacity is to be prepared, BTA reported.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661