The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
The Bulgarian state-owed natural gas supplier Bulgargaz has proposed that the price of natural gas for November increases by around 8% to nearly 66 BGN per megawatt-hour, excluding fees and taxes, reported BNR's journalist Yuliana Kornazheva. The..
The growth of the national economy in the second quarter of 2025 accelerated by 3.5% on an annual basis. According to an analysis by the Bulgarian National Bank - BNB, the main factors for the acceleration are the decrease in imports..
For the first time, Bulgaria’s Minister of Finance Temenuzhka Petkova took part as an observer in the regular meeting of the Eurogroup held in Luxembourg, the Ministry of Finance said. Until now, Bulgaria has only participated in Eurogroup..
+359 2 9336 661