The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
The liquefied natural gas (LNG) terminal at Alexandroupolis, of which Bulgaria is co-shareholder, is already contributing to competitiveness in Greece and Bulgaria, but also in the entire region, said caretaker Energy Minister Vladimir Malinov after..
At a meeting with the ambassador of Japan to Bulgaria Hisashi Michigami, Bulgarian President Rumen Radev welcomed the interest by the Japanese side in the investment and trade potential of Bulgaria. The meeting was attended by proprietors and..
Bulgaria is going to the sixth early parliamentary elections in less than 4 years, and this hinders the constructive debate and the ratification of an important convention prepared by the International Labor Organization (ILO) and accepted by 44 countries..
In the space of 15 years, from 2005 until 2020, 75% of the farms in the country have disappeared – from 500,000 in 2005 down to 132,000 in 2020, said..
Bulgaria and India will intensify their cooperation in various sectors of mutual interest. This was discussed at a meeting of the Bulgarian Minister..
On October 31, 2024, 10 business leaders in Bulgaria founded the first Bulgarian-Czech Chamber of Commerce in the country. At the Embassy of the Czech..
+359 2 9336 661