“Kozlodyu NPP-New Build” Plc and NuScale Power LLC have signed a memorandum of understanding to consider deploying NuScale’s small modular reactor technology at the Kozlodyu site, two companies announced.
The document implements the cabinet’s decision, taken on November 14, 2020, to study the possibility of building another nuclear facility at Kozlodyu nuclear power plant in the context of the EU targets to ensue energy diversification and climate neutrality by 2050.
The memorandum of understanding is a proven commercial practice for projects of mutual interest which does not impose obligation for future investment decision or financial costs, reads the joint statement.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661