The cost of completing the two units of the Belene Nuclear Power Plant will be between 8 and 9.5 billion euro, estimates by the Bulgarian Atomic Forum Bulatom show.
Almost 1.5 billion euro has so far been spent on the project. Bulatom has estimated that it will take around 15 years after the units are made operational for the investment to pay off, and that the price of the electricity it produces may be lower than the stock market price. If Belene NPP’s two units function at full capacity they will be able to produce an annual 16 million megawatt hours of electric energy.
According to Bulatom the project is economically sound as the units can function for at least another 45 years after the investment has paid off.
For the first time in recent election history, the end election result leaves a party running in the election outside the National Assembly with a result of 3.999% (Velichie), 21 votes short of the electoral threshold, reads a position by the..
The Central Election Commission (CEC) is sending the prosecutor the video recordings of the ballot count in 7 polling stations where there is a discrepancy in the number of votes counted. The prosecutors will have to check whether there is..
The European Parliament has approved the nomination of Bulgarian Ekaterina Zaharieva as European Commissioner. She will be in charge of the 'Start-ups, Research and Innovation' portfolio. After her confirmation hearing in the European Parliament,..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
Acting Energy Minister Vladimir Malinov told a briefing that neither he nor the Energy Ministry had any information about the sale of Lukoil Neftohim..
Metallurgy, heavy and mining industry are an irrevocable part of the full-fledged economic development of Europe. This was stated by Bulgarian President..
+359 2 9336 661