Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Regional Minister Karadzhov is realistic about the infrastructure projects

Minister of Regional Development Grozdan Karadzhov
Photo: BGNES-archive

I have not promised to build a bridge in four years, because this is impossible, Bulgaria’s Minister of Regional Development and Public Works Grozdan Karadzhov said for Nova TV in connection with the announcement of this country’s Minister of Finance Assen Vassilev that Bulgaria would build 4 bridges over the Danube by the end of the term of office of the current cabinet. In Minister Karadzhov's words, the construction of a bridge takes a minimum of 6 years.

In his words, Struma motorway will not cross the Kresna Gorge via a tunnel, as proposed by this country’s Minister of Environment. Grozdan Karadzhov defended the current project which envisages that one of the routes of Struma motorway will pass through the Kresna Gorge and the other one will pass along the mountain ridge. The project will cost EUR 500 million and can be completed in 2028. The construction of the tunnel is four times more expensive, Minister Karadzhov added.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM

160 more workers laid off at ContourGlobal Maritsa East 3 coal-fired power plant

ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the procedure for notifying the institutions and the workers has been completed, the company’s..

published on 7/5/24 4:40 PM