Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

European Parliament’s LIBE monitoring group to hold hearing of Prosecutor General Ivan Geshev

Prosecutor General Ivan Geshev
Photo: BGNES

Bulgaria’s Prosecutor General Ivan Geshev has been invited to take part in a hearing at the European Parliament, organized by the EP’s LIBE Democracy, Rule of Law and Fundamental Rights Monitoring Group (DRFMG)

The sitting is to take place behind closed doors on 27 January. The LIBE monitoring group, which consists of 14 people, includes representatives of every political group in the European Parliament.

At the closed-door meeting, representatives of the government in Bulgaria are expected to present their plans of reform in the judiciary and of enforcing accountability for the Prosecutor General, as well as of effective legislative changes in the fight against corruption. The meeting will also focus on media freedom and preventing the so-called SLAPP lawsuits against journalists and activists as a form of legal harassment. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM