Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria starts work on implementation of its Recovery Plan on March 15

Photo: BGNES

The technical approval of the Recovery and Resillience Plan is expected on March 15, after which the assignment of projects can begin, Minister of Finance and Deputy Prime Minister Assen Vassilev said. He confirmed that according to the document, only energy facilities that do not meet environmental standards, such as Brikel and Bobov Dol, would be closed. The Deputy Prime Minister assessed the latest changes in the plan as positive for Bulgaria, especially at the backdrop of the situation in Ukraine.

 "It would have affected us much worse if we had accepted the closure of facilities in the Maritsa basin and the construction of a steam and gas plant." The plan includes the construction of facilities for storing electricity through batteries, Assen Vassilev said. According to him, the maintenance of such a facility was a matter of national security, especially in cases of disruption of global supplies and communication routes.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian pupils win 6 medals at Balkan Mathematical Olympiad

Bulgaria’s national team of mathematics put up an excellent performance at the Junior Balkan Mathematical Olympiad. Six Bulgarian students returned from the event in Antalya June 25-30 with six medals, the Ministry of Education has announced...

published on 7/1/24 1:46 PM
Patriarch Daniil

Patriarch Daniil: The Church's vocation is to bring together those who are divided

''The Church's vocation is to bring together those who are divided'', the newly-elected Bulgarian Patriarch Daniil said before his first Holy Mass. ''Today is a special day as we celebrate the translation of the relics of St. John of Rila to the Rila..

published on 7/1/24 11:58 AM

GERB's draft cabinet has three priorities

The first and most important goal is the adoption of the state budget. The second is the Recovery and Resilience Plan. The eurozone is a political issue and if we have a government, I believe we can move it forward and then go to elections, GERB..

published on 7/1/24 10:46 AM