The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
A cycling tour will gradually restrict traffic on the I-6 Sofia – Karlovo road /Sub-Balkan road/ in the 9-kilometer section from the junction for the village of Mirkovo to the village of Chelopech today, August 20, from 2:15 p.m. to..
Burgas Municipality and Vivacom Art Hall Oborishte 5 Gallery present the international American Art exhibition, which brings together works by some of the most significant American and world-famous artists of the 20th and 21st..
On Wednesday it will be mostly sunny with temporary increases in cloudiness. In some places in the mountainous and eastern regions, light rain can be expected. The highest temperatures will vary between 26° and 31°C; in Sofia –..
"There is no control body and it is not clear who checks the sports attractions, as well as who is responsible for their use". This was..
The Food Safety Agency of Azerbaijan has imposed temporary restrictions on the import of certain goods from some regions of Bulgaria and Croatia due to..
More and more young people in Bulgaria are succumbing to the easy access to quick loans, driven by the lack of financial experience, the desire for..
+359 2 9336 661