The energy regulators of Bulgaria and Greece have certified the Gas Interconnector Greece–Bulgaria (IGB).
The commercial exploitation of the interconnector is set to begin after 1 July, 2022. IGB is of strategic importance and allows for the linking of the Greek and the Bulgarian gas transmission systems, diversifying gas supplies to Bulgaria and Southeastern Europe. The interconnector will enable Bulgaria to receive, in the second half of 2022, the full amount of the 1 billion cubic metres of natural gas negotiated with Azerbaijan. The pipeline’s transmission capacity is 3 billion cubic metres, and will allow delivery of liquefied gas from USA, Algeria, Qatar, Egypt, Nigeria, Israel and Cyprus.
The papers have to be approved by the European Commission, in accordance with European norms, before the certificates enter into force.
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this occasion, Caretaker Environment Minister Petar Dimitrov called for work to improve and repair the water..
From March 30, 2025, a new direct flight will connect Sofia and Pisa, Italy. A statement from Sofia Airport states that the flights will be operated by the low-cost airline Ryanair and will operate three times a week - every Tuesday, Thursday and..
The parliamentary group of Democratic Bulgaria has offered GERB-SDS and "BSP-United Left" to vote "for" the candidacy of Silvi Kirilov from ITN for the post of Speaker of the 51st National Assembly. Yordan Ivanov, MP from "We Continue the..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661