The EU Energy Council has agreed that gas storage sites in the Community must be filled to at least 80% of their capacity by Nov. 1, 2022, and to 90% by Nov. 1 in subsequent years.
In the case of Bulgaria, which only has the Chiren gas storage facility, this means that it must be filled to 4.64 terawatt hours (TWh) for the coming winter and to 5.22 TWh for the winter of 2023.
During the meeting of the Council in Luxembourg, an agreement was signed between Bulgartransgaz EAD and the EU, under which the European Commission finances the expansion of the Chiren depot within the framework of the Connecting Europe Facility (CEF) with EUR 78 million, i.e. 80% of the price. The expansion will increase the storage volume at Chiren to one billion cubic metersand the daily production and injection capacities to 8-10 mcm.
The base interest rate in Bulgaria is decreasing to 1.91% as of July 1, announced the Bulgarian National Bank. The base interest rate is dropping by 0.16% compared to the previous month, when it stood at 2.07%. Thus, the base interest rate will be..
In 2025, Bulgarian tourism maintains sustainable growth despite global challenges. According to analysts, a record number of foreign visitors is expected in the coming months as a result of stable international markets and the..
The Bulgarian Investment Agency (BIA) and the Japan External Trade Organization (JETRO) are signing a memorandum of understanding that will give new impetus to the trade and economic relations between Bulgaria and Japan. The two countries are seeking..
After months of low inflation and even temporary deflation in April this year, according to official national statistics, the trend..
+359 2 9336 661