“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
For the first time in the 40-year history of the audio-visual show "Tsarevgrad Tarnov - Sound and Light" in Veliko Tarnovo, its two versions will be shown in one day, the press center of the municipal administration has reported...
The night sky will be mostly clear and in the morning in many places in the valleys and around water basins there will be fog. During the day it will be sunny, but in the Danube Plain it will remain foggy. The lowest temperatures..
Bulgaria consistently opposes proposals to remove the requirement for unanimity in decision-making within the framework of the EU’s Common Foreign and Security Policy, Minister of Foreign Affairs Georg Georgiev said in response to a question from MP..
In 2026, Bulgaria will assume the presidency of the EU Strategy for the Danube Region for the second time. The symbolic handover of the presidency took..
“The storm has mostly passed, but there are still risks”, Deputy Premier Tomislav Donchev told bTV regarding Lukoil . ''The first priority is to..
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks..
+359 2 9336 661