The entire country is currently working to complete the gas connection with Greece, Deputy Prime Minister and Minister of Transport, Hristo Alexiev, said. Together with the Minister of Regional Development and Public Works, Ivan Shishkov, he inspected the construction of the gas link between Greece and Bulgaria.
"The gas link is priority number 1 because it will provide the cheapest gas under the most favorable terms. The financial stabilization of Bulgargaz is also a priority", Alexiev pointed out. According to him, everything possible will be done in order to have the connection ready for use before the beginning of the heating season.
The low level of the Danube River makes navigation in the Bulgarian section difficult. Two sandbars have formed, Ivelin Zanev, executive director of the Executive Agency for Exploration and Maintenance of the Danube River, told..
The Ministry of Transport has published for public discussion changes to the Regulation on Unmanned Aircraft Systems. The establishment of training centers for drone operators is planned, in which the requirements are almost the same..
The Consulate General of Bulgaria in Toronto has sent an invitation via Facebook to Bulgarians in Canada to participate in a solemn rose planting ceremony in the municipality of Niagara Falls. The planting ceremony is scheduled to..
A segment of a global money laundering network operating through financial fraud has been dismantled, the Sofia District Prosecutor's Office and the..
A concert of the legendary Duke Ellington Orchestra will take place on the square in front of the National Palace of Culture in the..
Sofia Municipality has requested the removal of a tent camp set up in front of the Presidency building during a protest organized by the "Vazrazhdane"..
+359 2 9336 661