Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP Unit 6 is shut down for refuelling

Unit 5 of Kozloduy Nuclear Power Plant was shut down in April for an annual scheduled maintenance.
Photo: BGNES

One of the two operating units at Kozloduy NPP - unit six - will be shut down on September 24 for planned annual maintenance. Reactor refuelling with fresh nuclear fuel, equipment servicing, tests and inspections will be carried out. 

All the necessary spare parts for the repair of the unit, which is Russian technology, have been provided, as well as the needed qualified personnel, the plant assures. The planned annual maintenance of unit six should be completed by the end of October. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Photos: Marti Dimov/Facebook

It will take half a century to restore the forests destroyed by the wildfires

More than 4 , 500 of woodland in Pirin has been destroyed by the wildfires after July 25. There are still local outbreaks on the ground, said Ivan Rizov, director of Strumiany State Forestry Enterprise in an interview with the Bulgarian news..

published on 8/4/25 1:13 PM

57,000 pensioners continue to work in the state sector

225,788 Bulgarians with pension for length of service and age continue to work in order to earn additional income. If people with other types of pensions are added to them, their total number exceeds 350,000 people or over 17.5..

published on 8/4/25 11:56 AM
Rumen Draganov

Adopting the euro will not make tourism more expensive, it will even reduce some prices

Bulgaria's entry into the eurozone on January 1, 2026 will not make vacations more expensive. This is what Rumen Draganov, director of the Institute for Analysis and Forecasts in Tourism told the Bulgarian National Radio. The prices..

published on 8/4/25 11:14 AM