Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 6 of Kozloduy NPP put back into operation

Photo: Radio Vidin

The sixth unit of the Kozloduy NPP has been reconnected to the country's energy system, the nuclear power plant reported.

During tests after scheduled maintenance work, the reactor was stopped on October 29 as a technical problem was found in the cooling system of the generator in the non-nuclear part of the unit. After eliminating the reasons that led to the shutdown, the teams of the nuclear power plant carried out the necessary tests according to the requirements for safe operation. The checks carried out confirm that all systems are working normally, experts announced




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Patriarch Daniil

Patriarch Daniil: The Church's vocation is to bring together those who are divided

''The Church's vocation is to bring together those who are divided'', the newly-elected Bulgarian Patriarch Daniil said before his first Holy Mass. ''Today is a special day as we celebrate the translation of the relics of St. John of Rila to the Rila..

published on 7/1/24 11:58 AM

GERB's draft cabinet has three priorities

The first and most important goal is the adoption of the state budget. The second is the Recovery and Resilience Plan. The eurozone is a political issue and if we have a government, I believe we can move it forward and then go to elections, GERB..

published on 7/1/24 10:46 AM

GERB-SDS receives the first cabinet-forming mandate, proposes cabinet lineup

Bulgaria’s President Rumen Radev handed the first cabinet-forming mandate to Rossen Zhelyazkov who is the prime minister-designate of the largest parliamentary group-GERB-SDS. Rossen Zhelyazkov announced the structure and composition of the cabinet,..

published on 7/1/24 9:44 AM