Unit 6 of the Kozloduy Nuclear Power Plant will be disconnected from the country's power grid as of 10 December for an indefinite period.
According to information of the nuclear power plant, the cause is a leak in the hear conduit of the steam generator. The problem was identified at the beginning of December. At the end of October, Unit 6 of the nuclear power station was again disconnected from the energy grid a little after it had been switched on following planned annual maintenance.
The radiation background in the work premises and on the Kozloduy NPP site remains unchanged.
The newly elected Bulgarian Patriarch Daniil attended a reception at the US Embassy on the occasion of Independence Day, BGNES reported. The head of the Bulgarian Orthodox Church was invited by Ambassador Kenneth Merten to attend the..
Humanitarian aid provided by Bulgaria to the civilian population of Gaza was loaded in trucks that departed for the region on June 29, the Bulgarian Embassy in Jordan announced on Facebook. The shipment includes food, medicine, tents..
President Rumen Radev has held a working meeting with Greek Prime Minister Kyriakos Mitsotakis. In Athens, they discussed the urgent activation of work on strategic bilateral projects. At a briefing, Radev said that the liquefied..
“Five people from the parliamentary group are going to be “torn apart” during the voting for a cabinet but will, most probably, not give their..
The first joint operation of the newly formed Mine Counter Measures Task Group Black Sea involving Bulgaria, Turkey and Romania is to take place July..
The caretaker government has fulfilled its main task successfully – organizing fair and transparent elections for National Assembly and for European..
+359 2 9336 661