A project is being launched for extending the only gas storage facility in Bulgaria at Chiren in the region of Vratsa, Northwestern Bulgaria. The state-owned company Bulgartransgaz has assigned the project to a consortium that includes Glavbolgarstroy, in partnership with American companies. The facility is scheduled to be extended up to a capacity of 1 billion cubic metres of gas or double its current volume. The Russian equipment from the 1970s and 1980s will be fully replaced by US-made equipment. The project, in which around 600 million Leva (EUR 300 million) will be invested, is expected to be completed by the end of 2024.
At the moment Chiren is 80% full. The price of the gas there is high because the facility was filled during the months when gas prices had reached their highest point. That is why it is only used as a last resort.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661