"Bulgaria still depends on Russia for a number of parts and equipment for its nuclear power plant. We need them for the forthcoming planned repairs and maintenance", caretaker Minister of Energy Rosen Hristov said for the BNR with regard to the cabinet’s decision to approve a derogation of the EU sanctions against Russia enabling the Kozloduy NPP to purchase spare parts, materials and services.
"We are looking for alternative suppliers who can provide Bulgaria with such equipment and spare parts in the long term. We are working with all countries with such nuclear reactors. The key issue is to ensure Bulgaria's energy security and the operation of the Kozloduy NPP", Minister Hristov said. Rosen Hristov noted that this is not a one-off derogation and that such a derogation will be necessary in the future, because there are no substitutes for more than 40 components supplied by Russia.
The Bulgarian National Bank has lowered the base interest rate for the second consecutive month. As of August 1, it stands at 3.53%, down from 3.63% in July. Since the end of 2023, the base interest rate has been gradually falling. From February..
Moody's expects Bulgaria to join the Eurozone no later than the beginning of 2026. According to the rating agency, the growth of the Bulgarian economy in 2024 will be 2.9%. The ongoing domestic political crisis and the likelihood of new early elections..
Until the end of 2024, businesses will continue to receive compensations for high electricity prices. They will be 100% after a price of over 90 euros per megawatt hour on the stock exchange. The previous threshold was 100 euros. The..
In September, the overall Business Climate Indicator for the country decreased by 1 point compared to August. The decline reflects a less favourable..
T he LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The..
The final price proposed by Bulgargaz for the sale of natural gas to its customers in October is BGN 63.72 (EUR 32.58) per megawatt-hour before tax. The..
+359 2 9336 661