The construction is beginning in Pleven of a new malt plant on a 56 million Leva (EUR 28.6 million) French investment.
The aim of the enterprise, which is to begin production in 2024, is to meet the most modern production standards for productivity, safety and energy efficiency. 40% of the electricity necessary will be generated by photovoltaic park which will reduce the carbon footprint by over 1,700 tons of emissions a year.
At the opening, French ambassador to this country Joel Meyer stated that the investment would reinforce the entire ecosystem spanning farmers, end users, brewers, and the entire region.
More than 42% of Bulgarians are concerned about the development of artificial intelligence. According to a quick survey on the topic by the Myara agency, published by BTA, 37 percent of those surveyed said they were not familiar with..
Bulgarian Patriarch Daniil met yesterday with Prince Ghazi bin Muhammad - Chief Advisor to King Abdullah II for Religious and Cultural Affairs, the Bulgarian Patriarchate reported. The prince is part of the official delegation of..
The government will remain intolerant of any form of corruption. This was what Prime Minister Rosen Zhelyazkov said from the parliamentary rostrum regarding the investigation by the European Public Prosecutor's Office into the..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the..
+359 2 9336 661