Westinghouse Electric has signed a contract with Kozloduy NPP - New Capacities a contract for preliminary engineering activities for the construction of a new reactor using the AP1000 technology at the site of the Bulgarian nuclear power plant.
The contract foresees an assessment of the possibilities for integrating the Bulgarian industry in the project for the construction of a new nuclear capacity with American technology and for the maximum use of the existing infrastructure at the Kozloduy NPP site.
''The Church's vocation is to bring together those who are divided'', the newly-elected Bulgarian Patriarch Daniil said before his first Holy Mass. ''Today is a special day as we celebrate the translation of the relics of St. John of Rila to the Rila..
The first and most important goal is the adoption of the state budget. The second is the Recovery and Resilience Plan. The eurozone is a political issue and if we have a government, I believe we can move it forward and then go to elections, GERB..
Bulgaria’s President Rumen Radev handed the first cabinet-forming mandate to Rossen Zhelyazkov who is the prime minister-designate of the largest parliamentary group-GERB-SDS. Rossen Zhelyazkov announced the structure and composition of the cabinet,..
“Five people from the parliamentary group are going to be “torn apart” during the voting for a cabinet but will, most probably, not give their..
The first joint operation of the newly formed Mine Counter Measures Task Group Black Sea involving Bulgaria, Turkey and Romania is to take place July..
The caretaker government has fulfilled its main task successfully – organizing fair and transparent elections for National Assembly and for European..
+359 2 9336 661