Over the next seven years, more than BGN 1.5 billion (EUR 765 million) will be invested in measures under the transport connectivity program, as the measures are important for improving the climate and for the implementation of green policies, Minister of Transport Georgi Gvozdeikov said at the CEE Green Transition Forum in Sofia.
According to the minister, over 306 million euros will be used to improve the railway infrastructure, out of a total of over EUR 510 million of funds from the National Recovery and Resilience Plan. By 2026, this country needs to complete the modernization of railway transport, the minister said. He added that serious investments in the construction of charging stations for electric vehicles should be considered.
The leader of "DPS-New Beginning" Delyan Peevski has called on the caretaker government and all responsible institutions, including the parliament, to give MEP Elena Yoncheva a mandate to negotiate for the release of the captured..
God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..
An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they..
+359 2 9336 661