Over the next seven years, more than BGN 1.5 billion (EUR 765 million) will be invested in measures under the transport connectivity program, as the measures are important for improving the climate and for the implementation of green policies, Minister of Transport Georgi Gvozdeikov said at the CEE Green Transition Forum in Sofia.
According to the minister, over 306 million euros will be used to improve the railway infrastructure, out of a total of over EUR 510 million of funds from the National Recovery and Resilience Plan. By 2026, this country needs to complete the modernization of railway transport, the minister said. He added that serious investments in the construction of charging stations for electric vehicles should be considered.
The National Revenue Agency is inspecting currency exchange offices due to increased interest in buying euros . Within just one week, the exchange of Bulgarian leva into euros increased by 43%, the agency’s director, Rumen Spetsov, announced in..
Kiril Petkov announced at a briefing that he is taking political responsibility and resigning as co-chair of "We Continue the Change" (part of the PP-DB coalition, which has the second largest number of MPs in the National Assembly)..
A Japan-Bulgaria business forum on the topic of "Infrastructure, Energy and Digitalization" was held in Sofia. "Bulgaria has a whole palette of advantages. However, they are little known in Japan. Our task is to provide much clearer..
Another protest against the adoption of the euro took place in Sofia and other cities in Bulgaria on June 28. The protest in the capital Sofia..
+359 2 9336 661