Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Miners and energy workers continue to protest

Photo: Elena Balabanova-BNR

Miners and energy workers from Maritsa East coal mines continue to block Trakia motorway, the Pass of the Republic and the road section in the region of Gurkovo of the Sofia-Burgas road south of the Balkan Range.

Road blockades remain in place, although the National Assembly adopted on Friday night Bulgaria’s climate neutrality roadmap, according to which the production of electricity from coal will continue without limit until the end of 2038. Protesters still insist that the government withdraws the territorial just transition plans from the European institutions.

Late last night the protesting miners and energy workers did not have a unified position on how the protest should continue. Trade unionists are expected to go to them to explain how they accept the parliamentary decision and whether these are actually the specific actions they want to see from the state.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM