Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 6 of Kozloduy NPP has been shut down for planned repairs

Photo: Kozloduy NPP

The only NPP in Bulgaria - Kozloduy, started today the annual planned repair of one of its two units - Unit 6. The shutdown has been coordinated with the Electricity System Operator. Repairs and maintenance of the systems are expected to be completed by the end of November. The reactor of Unit 6 will be refueled with fresh nuclear fuel.
Unit 5 of the plant is operating according to the power generation schedule.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM
Rositsa Mateva

63 polling stations did not have required CCTV coverage

In 63 polling stations out of a total of 11 626 polling stations that should have been equipped with CCT V, there was no live video feed and recording of the 27 October snap elections. This was announced by the deputy chairperson and spokesperson of the..

published on 11/4/24 2:12 PM