Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

President Radev appeals with Constitutional Court regarding Agricultural Lands Act

Rumen Radev
Photo: BGNES

Bulgaria's President Rumen Radev has referred to the Constitutional Court the amendments to the Law on the Protection of Agricultural Lands, introduced with changes to the Law on Energy from Renewable Sources, with which he does not agree. 

The changes remove almost all restrictions on the placement of RES installations on arable land, which creates the risk of uncontrolled construction on high-quality agricultural areas and pastures of any type of energy production facilities - wind, solar, hydroelectric, geothermal or energy from biomass and biofuels. 

According to the president, this contradicts the Constitution, according to which land is the main national wealth, and arable land is used only for agricultural needs.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov

Premier Zhelyazkov: The defence capabilities of the European Union and NATO must be strengthened

''Sabotage groups are operational in Bulgaria, and they exert hybrid influence and are part of Bulgaria's political life'', Prime Minister Rosen Zhelyazkov said during parliamentary control in response to a question about whether there is data on..

published on 10/3/25 12:34 PM

Burgas Municipality declares a partial state of emergency due to heavy rainfall

The Municipality of Burgas has declared a partial state of emergency until October 6. Mayor Dimitar Nikolov said that evacuations will be carried out in the areas most affected by the heavy rainfall, if necessary.  The measure was introduced due to..

published on 10/3/25 11:11 AM
Tomislav Donchev

50% of all funds under the operational programs have been contracted, says Deputy Premier Tomislav Donchev

''Funds disbursed under all EU operational programs amount to 3.3 billion BGN (1.587 billion EUR). A total of 12 billion BGN (5.770 billion EUR) has been contracted, representing 50% of the total funding. Contracting has accelerated by 50%, and..

published on 10/3/25 10:51 AM