''The price of electricity from Units 7 and 8 of the Kozloduy Nuclear Power Plant should not exceed EUR 65 per megawatt-hour, which is the average mix for electricity prices in the EU. The financial framework for the construction of Units 7 and 8 at Kozloduy NPP should not exceed 14 billion", Bulgaria’s Minister of Energy Rumen Radev said.
Minister Radev and US Assistant Secretary of Energy for International Affairs Andrew Light signed an intergovernmental agreement for cooperation on the project to build a nuclear capacity at Kozloduy NPP and for the exchange of technologies and training of specialists.The exact cost of the new units will be known by the end of March from the report prepared by the American company Westinghouse, whose reactors will be used for the future capacities. Minister Radev added that he expects the total cost of the two units to be below EUR 14 billion. The decision of the Bulgarian government is for the contract to include ''fixed deadlines and a fixed price''.
Bulgaria’s debt for 2024 amounts to BGN 48.846 billion (EUR 24 billion), or 24.1% of the country’s GDP, preliminary data from the National Statistical Institute (NSI) show. In 2023, the country's debt was BGN 42.383 billion (EUR 20.8 billion), or..
A working individual living in a one-person household needs a net monthly income of 1,521 BNG (EUR 747) to cover basic needs. A three-member household needs 2,738 BGN (EUR 1,344). The income needed to cover minimum living costs increases by..
"Flower in a Test Tube" is an innovative project that creates a new product using plant biotechnology. But it does more than that—it tells a story about the power of the human mind and heart. The idea comes from Petar Neftelimov, a young man born with..
“Bulgaria’s accession to the euro area will have a positive impact on the economy, the people, the business sector and the whole country”, said Minister..
+359 2 9336 661