After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
The real estate market in Bulgaria has steadily been growing in the past few years. There has been talk of a price bubble, inflated to serious proportions at the time of the pandemic, though expectations that it is going to burst have come to nothing...
One of the key steps in the expansion of the underground gas storage at Bulgaria's Chiren gas storage facility, the construction of the above-ground infrastructure and the installation of new compressors, has already been completed, Energy Minister..
Transformation – this is the word that most accurately describes the current state of the Bulgarian industry. According to an analysis of sectoral data for the period from 2008 to the beginning of 2024, made by the Institute for..
The real estate market in Bulgaria has steadily been growing in the past few years. There has been talk of a price bubble, inflated to serious..
+359 2 9336 661