Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria imports electricity from Serbia produced from Bulgarian coal

Dimitar Manolov
Photo: Savina Spasova

During the winter, Bulgaria imports electricity from Serbia, which is produced from Bulgarian coal. The explanation of this paradox lies in the fact that Serbia is not an EU member state and does not pay carbon emissions, so it can offer us such electricity at a lower price, the President of the Confederation of Labor Podkrepa Dimitar Manolov said for BNR. 

In his words, the country's energy system is on the verge of collapse. "We let the Kozloduy Nuclear Power Plant face a difficult situation; we will build new capacities (Units 7 and 8 of Kozloduy NPP), but no one knows how much it will cost". ‘’Who would predict what the price of electricity will be on July 1 this year when household consumers enter the liberalized market? Politicians are talking about a 20% increase in the price of electricity, but there may be an increase of 22.5% or a 27%. I don’t know how they estimated that the price will increase exactly by 20%'', Dimitar Manolov said.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM