Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP Unit 5 shut down for refuelling

Photo: Kozloduy NPP

Unit 5 of the Kozloduy Nuclear Power Plant (NPP) has been temporarily shut down for its scheduled annual maintenance and refuelling, which is expected to last until mid-June this year, the plant's authorities have confirmed.

As part of Kozloduy NPP's diversification initiative, the reactor is loaded with fuel cartridges manufactured by the US company Westinghouse.

During each annual refuelling period, a quarter of the cartridges in the reactor will be replaced. This strategic approach will ensure a gradual transition to the new nuclear fuel over a total period of four years.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian-African Chamber of Commerce to develop relations with the Bulgarian Chamber of Commerce and Industry

Representatives of the Bulgarian-African Chamber of Commerce visited the Bulgarian Chamber of Commerce and Industry and met with its President Tsvetan Simeonov. Albena Jones, Dimitar Turlakov, and Anton Samsonov are among the founders of..

published on 2/19/25 9:08 AM
Photo: Jérémie Bergeron/Radio-Canada

Ministry of Foreign Affairs cautions Bulgarians on severe weather in Canada

The Ministry of Foreign Affairs recommends that Bulgarian citizens traveling or residing in Canada keep themelselves well-informed about the current weather conditions, and regularly check the status of their flights. The Canadian Meteorological..

published on 2/19/25 8:55 AM

Ministry of Finance releases 2025 draft budget

The Ministry of Finance published the 2025 draft budget and the medium-term budget forecast for the 2025-2028 period. The projected deficit for 2025 is up to 6.4 billion BGN (EUR 3.3 billion), which is 3% of GDP.  Expenditures will not exceed 40% of..

published on 2/19/25 8:42 AM